Aalo-X
Demonstrating the future of nuclear x AI
Experimental power plant, purpose-built for directly powering an AI data center. Currently under construction next to Idaho National Lab. Will prove the 10 MW Aalo-1 reactor for use in future 50 MW Pods.
Countdown to Aalo-X
0 MONTHS 1 Hours 35 Mins 6 Secs
Mission: Criticality by July 4, 2026.
Completed
Approved to Proceed by DOE
We executed a contract with DOE allowing us to build and operate Aalo-X at INL.
Site Preparation & Excavation
Grading, utilities, and foundation excavation for reactor and balance-of-plant areas.
In Progress
Preliminary Design Review
We assess and design out natural disaster risk and demonstrate safety analyses.
Basemat & Ground Slab Pour
Reinforced concrete foundation for the Steel Composite (SC) reactor building modules.
Completed
Site Prep & Excavation
We are leveling the site and excavating below-grade structures, readying the foundation.
Steel Composite Module Installation
Rapid assembly of prefabricated SC wall and roof modules for containment
IN PROGRESS
Basemat & Ground Slab Pour
Aalo-X structures include the reactor building, control center, turbine building, and electrical infrastructure.
Reactor Vessel Placement
Setting and alignment of the primary reactor vessel and support structures.
Completed
Module Fabrication and Site Assembly
In our Austin TX factory, we build modules to ship and install on site.
Fuel Loading & Zero Power Criticality
Insertion of UO₂ fuel elements and initial low-power physics tests to confirm criticality behavior.
Upcoming
Steel-Concrete Composite Assembly
SC composite walls combine the best structural and shielding properties of both materials.
Primary System Integration
Installation of core support, sodium piping, pumps, and heat exchangers within the vessel boundary.
in progress
Fuel and Moderator Installation
In the reactor vessel, we will load fuel and moderator assemblies into a matrix.
Secondary Loop & Heat Rejection Systems
Installation of intermediate sodium loop, air heat exchangers, and natural-draft stacks.
Upcoming
Electrical, Control, and I&C Final Testing
Control rods are tested and qualified for performance to design basis and beyond design basis conditions.
Electrical, Control, and I&C Installation
Wiring, control cabinets, autonomous system integration, and instrumentation calibration.
JULY 4, 2026
A Historic Milestone: Criticality
Aalo takes an advanced reactor to criticality less than 3 years after its founding.
Non-Nuclear Commissioning & Sodium Fill
System flush, inert gas purge, sodium loading, and heat-transport testing.
Upcoming
Criticality Provides Licensing Foundation
Experiments in Aalo-X provide physics, materials, and performance data, setting us up for commercial licensing.
Full Power Operation & Balance-of-Plant Commissioning
Gradual power ascension, turbine-generator synchronization, and steady-state operation.
Our Mission: Deliver Aalo X in 12 months. Here's how.
Hover over a month to learn more
September 2025
Specific Task Completed
A short description adding more context for this event if needed
September 2025
Specific Task Completed
A short description adding more context for this event if needed
September 2025
Specific Task Completed
A short description adding more context for this event if needed
September 2025
Specific Task Completed
A short description adding more context for this event if needed
September 2025
Specific Task Completed
A short description adding more context for this event if needed
September 2025
Specific Task Completed
A short description adding more context for this event if needed
Why build Aalo-X?
1
2
3
4
5
6
Sodium Coolant
Inherent safety with extremely high boiling point and thermal conductivity
UO2 LEU Fuel
Incredibly strong supply chain to support the demands of the modern data center
AI Data Center Match Made in Heaven
Prove out the future of powering AI data centers
Factory as a Product
Aalo-X proves out our Gigawatt Factory vision, it’s not just about what happens on site.
Aalo-X. A new dawn.
Aalo-X is ushering in the Second Atomic Age with reactor 53.
10 MWe, 30 MWth
Maximum power output. Capacity factory will be optimized over time.
Liquid Metal
Sodium's high thermal conductivity allows for shutdown passive cooling.
Proven UO2 Fuel
Leveraging existing supply chains for speed and scalability.
Powering AI
Aalo-X will power a co-located data center, proving the model for the Pod.
Factory Fab
Not just a reactor. Aalo-X helps to prove our Gigawatt Factory vision.